Top Rust ServersObservatory · live
Live Servers11,452 Players34,594 Populated3,060 Fresh wipes · 3h73 Scanevery 5 min

RS-15948Modded server

MS Project | SOLO/DUO

Offline 80.221.91.195:28015 checked 11d ago

moddedcarbon
Connect
Players now
0/ 25
0% full
7-day average
0
peak –
Rank
#15,948
top 70%
Last wipe
17d ago
no schedule published
Next wipe
–
too few wipes seen yet
Light curve

Players

No hourly history yet.

Hourly average and peak, UTC.

Systems telemetry

Server performance

This server has not answered a direct query in the last 48 hours.

48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.

Standing

Rank

daily · 1 is best
RankRank in region
15k10k15k20k20 Sep24 Sep28 Sep1 Oct5 Oct9 Oct

Top 70% of all ranked servers. Ranked on player hours over the last seven days.

Orbit

Wipe schedule

too few wipes seen yet

Not enough wipes seen yet to tell when the next one is. Every server wipes at the monthly force wipe.

usual gap8.5 daysbetween real wipes
wipe-day peak1players, last three wipes
crowd held0%else halves by day 1

The first 48 hours of its last wipes

Sat 26 SepThu 17 Sep
00.250.50.751+0h+9h+19h+28h+38h+47h

Players each hour, from the hour of the wipe. The latest peaked at 1, 0 hours in.

Record

Wipes

newest first
WipedPeakCrowdLastedPlayers before
Sat 26 Sep, 09:07 UTC17d ago 1 – running 1
Thu 17 Sep, 20:03 UTC26d ago 1 halved by day 1 8.5 days 0

Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.

Nearby objects

Similar servers

The same kind of game, then region, group limit, rate and wipes.

Readouts in words

Quick answers

From the figures on this page.

Player activity

What is the typical player count on MS Project | SOLO/DUO?

MS Project | SOLO/DUO is offline at this moment; the last signal was 11 days 9 hours ago.

How is MS Project | SOLO/DUO ranked?

On player hours across seven days, MS Project | SOLO/DUO is #15,948, inside the top 70% of all ranked servers.

Tags, lists, and filters

On Top Rust Servers, which lists and filters carry MS Project | SOLO/DUO?

These Top Rust Servers lists count MS Project | SOLO/DUO among their servers: Top modded Rust servers. These are the filters that bring it up on the server list: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more.

What is the meaning of the tags on MS Project | SOLO/DUO?

gmrust (Game mode): Survival follows the standard Rust ruleset; mp25 (Max players): There are 25 slots; ts8 (Group limit): The team limit is 8, which is the game default; v2633 (Protocol): To join, your game must be on protocol 2633; cs162929 (Build): Game build: 162929; ptrak (Networking): Network layer: RakNet, the standard for the game; $r? (Region code): No region code is assigned; ^z (Modded): The game is changed by plugins or settings, so it is listed as Modded; ^y (Carbon): Carbon is the plugin framework in use are the tags MS Project | SOLO/DUO publishes, and the game's server browser reads them. The top of this page also shows the time its world was made, its queue, and its players now, all from the tags.

Map and rules

What is the map on MS Project | SOLO/DUO?

The map on MS Project | SOLO/DUO is procedural, size 3,500, seed 789936933, and generated by the game. Viewing it on RustMaps is possible from this page: the same size and seed give the same map.

What settings and rules does MS Project | SOLO/DUO use?

The name MS Project | SOLO/DUO does not state a gather rate. Up to 8 players per group, as the game defaults. It runs survival, standard survival: gathering, building and raiding. Combat and raiding between players are allowed. Plugins or settings change the game; it is listed as Modded. Carbon plugins are in use. The server runs with VAC on.

Server details

What version is MS Project | SOLO/DUO running?

Rust network protocol 2633 and build 162929 is what MS Project | SOLO/DUO runs, on Linux. Your game needs the same protocol to connect; Steam takes care of updating it.

Where can MS Project | SOLO/DUO be found?

No region is published by MS Project | SOLO/DUO. Top Rust Servers does not look up where the machine stands; it shows where a server says it is. 80.221.91.195:28015 is its address.

How reliable is MS Project | SOLO/DUO?

The server MS Project | SOLO/DUO is down at the moment, with its last appearance 11 days 9 hours ago. It spent 0 of the last 168 hours online across 7 days, giving 0% uptime. The first time Top Rust Servers saw it was on 13 September 2026.

Wipe cycle

What can you expect on wipe day on MS Project | SOLO/DUO?

Recent wipes saw an average peak of 1 players at their busiest. The peak of the latest wipe came 0 hours after it began. Half the peak was held until the next wipe in 0% of recent wipes. When the peak was not held, numbers fell below half by day 1.

How often does MS Project | SOLO/DUO wipe?

Not enough wipe data exists yet to identify the rhythm of MS Project | SOLO/DUO. The monthly force wipe applies to every Rust server; the next one is on Thursday 5 November at 19:00 UTC. The world it is running now dates from 17 days 21 hours ago.

Joining the server

What are the steps to join MS Project | SOLO/DUO?

To connect, start Rust, hit F1, and enter client.connect 80.221.91.195:28015. You can also join by clicking Launch Rust here, which opens Rust through Steam and links you in.

Spectrum

Server tags

What each one means.

Published as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y

Game

gmrust
Game mode Survival follows the standard Rust ruleset.
mp25
Max players There are 25 slots.
ts8
Group limit The team limit is 8, which is the game default.
v2633
Protocol To join, your game must be on protocol 2633.
cs162929
Build Game build: 162929.
ptrak
Networking Network layer: RakNet, the standard for the game.
$r?
Region code No region code is assigned.

Mods and access

^z
Modded The game is changed by plugins or settings, so it is listed as Modded.
^y
Carbon Carbon is the plugin framework in use.

Players now (cp), the queue (qp) and the wipe time (born) are in the tag string too; they change every few minutes and are shown at the top of the page. Flag meanings are Facepunch's.